Wastewater Treatment Works – Kent / Penstock Releasing

Three 72 inch penstocks released in 6 hours. Freeing the penstocks avoided a lengthy plant shutdown and saved the treatment works time and a huge overpumping cost, estimated around £2 million pounds.

Previous | Next Job