Sewage Treatment Works – Leeds / Sewage Valve Releasing

Releasing this massive 72 inch valve was swift and cost efficient. The alternative was to shut down the works and overpump the wet well into a fleet of tankers at a cost in excess of one million pounds.

The treatment works continued to operate normally during the releasing process and the valve was freed within four hours.

Previous | Next Job