Wastewater Treatment Works – Kent / Penstock ReleasingCutlass Technologies was called to release three 72-inch seized penstocks at a wastewater treatment works in Kent. Using our specialist penstock freeing technology, the penstocks were carefully released in just 6 hours, fully restoring their operation. The work avoided a lengthy plant shutdown and prevented the need for costly overpumping, estimated at around £2 million. |